From the initial idea of the spot until first shooting was 6 weeks. Most of the time spend was thinking on the design and its options and disabilities. The actually design-drwaings lasted less then a day. Manufacturing some special parts and building the rig was 3 days work, 1 person. Manteling and dismanteling the rig on the locations took us a bit over the hour. Most of time spend was lining up the camera in all its axes.. (having done one ax always seems to change the other 3...-)
here is a link to picture and drawing
ReplyDeletehttp://www.solidgripsystems.eu/pendule
Onno- how long did you have to design and then to build the rig?
ReplyDeleteFrom the initial idea of the spot until first shooting was 6 weeks.
ReplyDeleteMost of the time spend was thinking on the design and its options and disabilities. The actually design-drwaings lasted less then a day. Manufacturing some special parts and building the rig was 3 days work, 1 person.
Manteling and dismanteling the rig on the locations took us a bit over the hour. Most of time spend was lining up the camera in all its axes.. (having done one ax always seems to change the other 3...-)